TimeLine: Gantt Charts and Planning
Project-planning and Gantt app for tasks, calendars, exceptions, dependencies, quantities, productivity, and chart-driven scheduling.
TimeLine is the planning app in WorkStudio.
Use it when a project needs a real Gantt schedule with task rows, dependencies, working calendars, calendar exceptions, milestones, and task bars that stay aligned with the table.
TimeLine opens with ready schedule support for tasks, calendars, and exceptions, so you can start planning immediately instead of assembling the structure by hand.
It supports the main planning fields you expect: Task ID, Task Name, Start Date, Duration, End Date, Calendar, Predecessor, Task Type, Productivity, Quantity, and the Gantt chart itself.
TimeLine is fully compatible with TableStudio workbooks. That means the same save flow, workbook structure, WBS handling, formulas, print preparation, supporting sheets, and cross-app links stay available while you work in a planning-first screen.
If needed, the same file can continue to grow with normal TableStudio sheets for quantities, resources, cost tables, supporting lists, or export helpers without any conversion step.
If you want to add a chart to an existing table instead of starting from the ready TimeLine layout, open Gantt Column in TimeLine.
Core references: Create a New TimeLine, TimeLine Columns, Gantt Column Settings, Calendars, Calendar Exceptions, Dependencies and Predecessors, and Calculation Engine.
If you want AI to draft a first schedule from text, open Create Gantt With AI. This is an early drafting assistant and should be reviewed before it is used as a real programme of works.
Start with the tutorials: Create a Simple 5-Task Gantt in TimeLine, Create Links with the Mouse in TimeLine, Use Calendars and Exceptions in TimeLine, and Build a Structured TimeLine Schedule.
Related: TableStudio, TableStudio Column Types, Column Type: List, Column Type: User, Cell Options.
Create a Gantt in Less Than a Minute
Watch the 42-second HD walkthrough for creating a small Gantt schedule in TimeLine.
Planning stays visual and data-driven
TimeLine keeps the task table, calendars, exceptions, and chart in one consistent planning workspace.